Joint Outfall H Unit 8L Trunk Sewer Rehabilitation
Repairs to about 4,161 feet of aging sewer mains will be completed by installing cured-in-place pipe liners inside corroded 18- and 24-inch concrete pipes and cracked clay pipes. Fourteen manholes will also get protective coatings. This trenchless rehabilitation will reduce leaks and infiltration, prevent failures, and extend the system’s service life, with minimal excavation. Related supporti…
The project will rehabilitate approximately 4,161 feet of existing corroded 18- and 24-inch diameter reinforced concrete pipe (RCP) and cracked vitrified clay pipe (VCP) on the Joint Outfall H Unit 8L Trunk Sewer and the Joint Outfall H Unit 8L Relief Trunk Sewer with cured-in-place pipe liner a…
Source
Dates
Supporting links
Similar opportunities
-
Sinking Creek Sewer Rehabilitation: CIPP lining, new gravity sewer, and manhole upgrades
-
Large Diameter Sewer Rehabilitation Program - Phase 3A, Part 2
-
Sanitary sewer rehabilitation: 6,700 ft CIPP and 11 maintenance holes
-
Sewer Pipe-in-Pipe Rehabilitation with CIPP and 11 Maintenance Holes (6,700 ft)
-
PW - CPN 103412 - Water and Sanitary Sewer Replacements Contract 2020, WSM-H
Secure Grant Funding 10x Faster