Sinking Creek Sewer Rehabilitation: CIPP lining, new gravity sewer, and manhole upgrades
This project will rehabilitate sewer lines in the Sinking Creek area by installing about 403 feet of new 8-inch gravity sewer and UV-cured CIPP lining for roughly 9,470 feet of existing 8–12 inch pipe. Work includes rehabilitating 70 lateral-to-main connections and locating and raising five manholes. Contractors may be sought to perform the construction.
Installation of approximately 403 LF of 8â gravity sewer, UV-cured CIPP liner throughout approximately 9,470 LF of sewer line (ranging in size from 8â to 12â diameter), 70 connection rehabilitations of lateral line to main line, and locating and raising 5 manholes.
Source
Dates
Supporting links
Documents
Similar opportunities
-
Joint Outfall H Unit 8L Trunk Sewer Rehabilitation
-
Sanitary sewer rehabilitation: 6,700 ft CIPP and 11 maintenance holes
-
Sewer Pipe-in-Pipe Rehabilitation with CIPP and 11 Maintenance Holes (6,700 ft)
-
Large Diameter Sewer Rehabilitation Program - Phase 3A, Part 2
-
Water and Sanitary Sewer Main Replacement Contract, Part 1
Secure Grant Funding 10x Faster
Scout delivers AI-powered grant writing paired with experts that's faster, more affordable, and built to win.
Already have an account? Sign In
Trusted by 500+ Happy Customers