Highway resurfacing, micro‑milling, guardrails, and striping on SR‑118/US‑43 in Gu‑Win, AL (4.704 miles)
Project to micro‑mill, resurface with a scrub seal, install guardrail, and add traffic striping along 4.704 miles of SR‑118/US‑43 in Gu‑Win, Alabama. Work spans from SR‑171 to 0.430 miles east of CR‑4. Suitable for roadway resurfacing and safety improvement contractors.
for constructing the Micro-Milling, Resurfacing (Scrub Seal), Guardrail Installation, and Traffic Stripe on SR-118 (US-43) from the intersection of SR-171 to a point 0.430 mile east of the intersection of CR-4 in Gu-Win. Length 4.704 mi.
Source
Dates
Supporting links
Similar opportunities
-
AL DOT bid: Micro-milling, resurfacing, guardrail, and striping on SR-118 (US-43) in Gu-Win (4.7 miles)
-
Highway resurfacing and guardrail project on SR-109 (FL line to SR-1/US-231), 9.846 miles
-
Alabama SR-109 resurfacing, guardrail and striping from Florida line to US-231 (9.846 miles)
-
Alabama DOT: SR-3 (US-31) safety widening and resurfacing from Cullman County line to Lacon Rd (1.818 miles)
-
Alabama SR-74/US-278 micro-milling, resurfacing, and striping near Cullman (7.9 miles)
Secure Grant Funding 10x Faster
Scout delivers AI-powered grant writing paired with experts that's faster, more affordable, and built to win.
Already have an account? Sign In
Trusted by 500+ Happy Customers