AL DOT bid: Micro-milling, resurfacing, guardrail, and striping on SR-118 (US-43) in Gu-Win (4.7 miles)
Alabama seeks contractors for micro-milling, scrub seal resurfacing, guardrail installation, and traffic striping along SR-118 (US-43) in Gu-Win. The project extends from the SR-171 intersection to 0.43 miles east of CR-4, covering approximately 4.7 miles.
for constructing the Micro-Milling, Resurfacing (Scrub Seal), Guardrail Installation, and Traffic Stripe on SR-118 (US-43) from the intersection of SR-171 to a point 0.430 mile east of the intersection of CR-4 in Gu-Win. Length 4.704 mi.
Source
Dates
Supporting links
Similar opportunities
-
Highway resurfacing, micro‑milling, guardrails, and striping on SR‑118/US‑43 in Gu‑Win, AL (4.704 miles)
-
Alabama DOT: SR-3 (US-31) safety widening and resurfacing from Cullman County line to Lacon Rd (1.818 miles)
-
Highway resurfacing and guardrail project on SR-109 (FL line to SR-1/US-231), 9.846 miles
-
Alabama: SR-134 micro-milling, resurfacing, and striping from Dale Co. line to SR-1/US-431 (6.229 miles)
-
Alabama SR-109 resurfacing, guardrail and striping from Florida line to US-231 (9.846 miles)
Secure Grant Funding 10x Faster
Scout delivers AI-powered grant writing paired with experts that's faster, more affordable, and built to win.
Already have an account? Sign In
Trusted by 500+ Happy Customers