Cameron Road Wastewater Improvements
Existing 8-, 10-, and 12-inch wastewater pipes near Cameron Road and Capital Plaza are too small for today’s flow levels, creating a high risk of sewage overflows. Increasing capacity in this area is needed to reduce overflow risk.
The existing 8-inch, 10-inch and 12-inch wastewater pipe near Cameron Road and Capital Plaza has a very high risk of overflows because it does not have enough capacity for current wastewater flows.
Source
Agency: City of Austin
Dates
Response Deadline: December 11, 2025