Lock and Dam 8 Spillway Concrete Supply

Department of Defense

Description
  • Buyer/Project: USACE St. Paul District seeks a contractor to deliver ready-mix concrete to the Minnesota side of the spillway at Lock & Dam 8 (Genoa, WI).
  • Work specifics:
  • Deliveries occur in winter only: November 1–March 1, over two consecutive years.
  • Total quantity: approximately 350–450 cubic yards.
  • Delivery sizes: about 30 cubic yards per load (±10%).
  • Access constraint: trucks must back across a 20-foot-wide Reno spillway; winter cond…

The U.S. Army Corps of Engineers (USACE), St. Paul District has a requirement for a contractor to deliver mixed concrete to the Minnesota-side of the spillway located at Lock and Dam 8 in Genoa, WI.  These deliveries will take place during the winter months (November 1 – March 1) over a two-year…

Source

Grant ID

W912ES25QA084

Agency

Department of Defense

Subcategory/Subagency

Department of the Army

Key Dates

Response Deadline

October 20, 2025