Seattle seeks bids for PS 56 abandonment and trenchless sewer installation (2025)
The City of Seattle is soliciting construction bids to decommission Pump Station 56, install a CIPP liner on an existing 15-inch sewer, and build a new 8-inch sewer via trenchless guided boring, with related utility relocations and pavement restoration. The project is in the Blue Ridge neighborhood near 10334 Bedford Ct NW, with an engineer’s estimate of about $5.64M. Work is covered by the Ci…
Project Description: This project consists of the following elements of work:A. Pump Station 56 Abandonment:1. Salvage equipment for Owner as identified on the Drawings and Specifications and as directed by the Engineer.2. Remove above-grade structures, cabinets, hatches,…
Source
Dates
Supporting links
Similar opportunities
-
Seattle PS 56 Pump Station Abandonment and Trenchless Sewer Installation (2025)
-
Seattle PS 56 Decommissioning and Trenchless Sewer Installation (2025 Construction Bid)
-
Seattle PS 56 decommissioning and trenchless sewer installation (2025) - construction bid
-
Seattle PS 56 Abandonment and Trenchless Sewer Installation (2025)
-
Seattle seeks contractor for PS 56 abandonment and trenchless sewer installation (2025)
Secure Grant Funding 10x Faster
Scout delivers AI-powered grant writing paired with experts that's faster, more affordable, and built to win.
Already have an account? Sign In
Trusted by 500+ Happy Customers