Road resurfacing on US 64 (SR 15) from West College St to near Five Points Rd
This project will resurface a section of US 64 (SR 15) from West College Street to near Five Points Road, covering LM 9.32 to LM 18.39. Work may include microsurfacing or a thin mix overlay along the corridor.
The resurfacing (either microsurface or thin mix overlay) on U.S. 64 (S.R. 15) from West College Street (L.M. 9.32) to near Five Points Road (L.M. 18.39).
Source
Dates
Supporting links
Similar opportunities
-
US-64 Resurfacing and Bridge Epoxy Overlay from West Gaines St to Eagle Factory Rd
-
US-64 (SR-15) resurfacing with bridge epoxy overlay from West Gaines St to Eagle Factory Rd
-
Resurfacing SR 358 from SR 44 to near SR 394 (approx. 6.1 miles)
-
US 64 (SR 15) resurfacing and bridge epoxy overlay from Tomlin Rd to Woodbridge Rd
-
SR 96 resurfacing and bridge deck repairs (Cox Road to Rutherford County line)
Secure Grant Funding 10x Faster
Scout delivers AI-powered grant writing paired with experts that's faster, more affordable, and built to win.
Already have an account? Sign In
Trusted by 500+ Happy Customers